An EPC is only required for a building when constructed, sold or let. EPCs for the sale or letting of buildings other than dwellings will be valid for 10 years. Energy assessors will need to be qualified for the type of building being assessed.
For non-dwelling EPCs, the levels are :
- Level 3 – simple, existing non-dwellings: small buildings such as converted houses or doctors surgeries (using SBEM)
- Level 4 – new and existing non-dwellings: e.g. small purpose built office buildings (using SBEM)
- Level 5 – new and existing complex non-dwellings: e.g. large office buildings or factories (using modelling tools e.g. DSM).
ECS are able to provide EPC at levels 3, 4 and 5.
For more information or for a quotation for a Commercial EPC please contact :
Email : mitesh@env-cont.co.uk or Call : 0208 902 1901 |